Customer FAQ's
- How does TPS interact with my
accounting program so my General Ledger is kept up to date?
- How
does the TPS licencing work with administrative and personnel that
we track time for?
- How
secure is the information in TPS?
- What
report writer does TPS use?
- Is the
TPS database "Open" to MS Access?
- What
does TPS support include?
- What
is the minimum configuration (both hardware and software)?
- What
is the TPS Guarantee of Satisfaction?
- Is it
possible to share the "contacts" within MS Outlook without MS
Exchange installed on the network?
- Do I
need MS Word? why not Word Perfect?
- "Can't
open msdadc.dll"
- Zero
amount invoices
- My
Statements do not show the details in the body?
- I am
unable to choose the landscape format for the Time entry report?
- How do
I adjust taxes after the fact?
- Is it
possible to run an A/R Reconciliation report for some date in
history?
- What
do all the "codes" mean in the Multiple Employee Query?
- I am using a Linux
server and when I install or update TPS I get an error message part
way through the report file install and the install stops?
How does TPS
interact with my accounting program so my General Ledger (G/L) is kept up
to date?
TPS operates as your
"Accounts Receivable (A/R) Sub-Ledger maintaining all the records on
the time entered, the Work in Progress (WIP), invoices, payments,
adjustments and finance charges. TPS is a full-featured Time, WIP
and AR system so there is no need to duplicate the information in
another accounting program. Each month, TPS provides a couple of
simple reports that provide the total amounts required for a
recurring G/L batch to record the "change in WIP and change in AR".
Some firms break out the cash received into separate deposits to
make it easier to reconcile the bank account.
How
does the TPS licensing work with administrative and personnel that we
track time for?
TPS is licensed by
"active" timekeepers - the number of people you keep track of time
for (not how many employees enter time or how many employees are in
the firm). If you have 17 employees and one leaves and you hire one you
will have 18 employees time records in WIP but only 17 are 'active'
timekeepers thus a 17 timekeeper license is all that is required.
How
secure is the information in TPS?
The TPS database uses
a secure encryption to ensure no unauthorized access to the
information. Each user is granted individual rights to the specific
functions and features of TPS. For instance it is possible to
eliminate the display of the billing rate of an employee.
What
report writer does TPS use?
Creating custom
reports is achieved using Crystal Reports (11). Crystal
reports is a powerful Windows-based report writer. TPS also uses MS
Word 97 -Word 2007 for invoice templates and forms.
Is
the TPS database "Open" to MS Access?
Due to the data
encryption security, the MS Access database is not accessible except
through Crystal reports. TPS does provide an "Export" feature that
will copy all the non-encrypted information to a separate "Export.mdb"
file.
What does TPS support include?
Support provides
virtually unlimited access to our knowledgeable support staff. All
calls are handled on a first-come, first-served basis. During slow
times our response will generally be immediate or 1 hour maximum. During peak support
times, we have not exceeded 24 hours.
What is the minimum configuration (both hardware and software)?
See
Specifications -
The hardware and software requirements for TPS are:
Minimum
Configurations
Hardware
Is
it possible to share the "contacts" within MS Outlook without MS
Exchange installed on the network?
Yes - TPS provides a
non-Outlook configuration. Using an Outlook configuration, Microsoft
provides an alternate method for sharing MS Outlook folders if MS
Exchange is not installed on the network. The alternative is MS Net
Folders. Detailed instructions for installing this option by
emailing TPS support.
Do
I need MS Word? why not Word Perfect?
Yes, on at least one
work station if you plan on using the TPS invoicing feature. TPS chose to
standardize on MS Word as it's invoice and form generation word
processing application.
"Can't open msdadc.dll"
Some versions of
Windows 95 require the installation of two separate files, DCOM.ex
and MDAC_TYP.exe. If you receive this error, contact TPS support and
you will be given a web site address to access these files.
Zero Amount Bills
a) Zero bill - Quick
bill. This allows the write-off (markdown) of all the remaining WIP
in a client (or engagement).
b) Zero bill - Detail bill. This allows the write-off (markdown) of
selected line items of WIP to zero dollars.
TIP To maintain the continuity of the invoice numbers, prior to
entering/creating a new "zero" invoice, go to Firm Properties and
change the default Invoice Prefix to a different character, like
"Z", run the zero invoices and then change the default Invoice
Prefix back. This will create a separate set of numbering for the
"Z" type invoices.
Details Not Printing in Statements
Likely there is a
second Crystal .dll file located on the computer
Go to Windows Explorer - Choose - Find Files or Folders and in the
file name type - p2sodbc.dll
If there are two files listed, go to the Windows Crystal directory
and rename the p2sodbc.dll to something like p2sodbc_old.dll
Unable to choose Landscape format in Time Entry Report
In this report it is
necessary to change the format of the printer prior to running this
report. We are aware of this problem and are investigating
alternatives for future releases.
How
do I adjust taxes after the fact?
You have to create
payment $963, click ok, then create one adjustment $107,and click
ok. TPS automatically create two payment transactions: PaymentID
InvoiceID ClientID PayDate Amount Tax Status
93 470 6 10-Apr-2000 ($100.00) ($7.00) A
92 470 6 10-Apr-2000 ($900.00) ($63.00) C
Is
it possible to run an A/R Reconciliation Report for a date in history?
Yes, but it requires
the computer system date to be set to the desired date prior to
running the report.
What do all the "codes" mean in the Multiple Employee Query?
T Time
W WIP
H History (connected to Invoice)
R Transfer
E Expense
V Prov. Mark
N Interim
I am using a Linux
server and when I install or update TPS I get an error message part
way through the report file install and the install stops?
This is a known
issues with our installer software and Linux. to work around this,
install TPS locally (on the C or local disk drive) and copy the
Reports folder.